Procurement

User Guide

You can download the package and addendums until the last day of proposal/offer submission.

Search


Auctions

Bid Number Bid Name Documents will be available until Proposal / Offer / Qualifications Due Date Status Information
AVP-RFP-26-27-02 OVERSIGHT MANAGEMENT SERVICES FOR PROGRAM (FEMA) 12/16/2026 12/16/2026 Active
Summary

The selected Oversight Management (FEMA) Firm (OM) shall provide professional and technical services to assist PRPHA in the planning, coordination, procurement support, project controls, compliance monitoring, and overall administration of projects funded through FEMA Recovery, federal, state, or local sources.

AVP-IFB-25-26-03 NEW FACILITIES AT RAFAEL HERNANDEZ KENNEDY 03/30/2026 03/31/2026 Adjudicated
Summary

The Puerto Rico Public Housing Administration (PRPHA) will receive Sealed Bids in accordance with the Bid package instructions and requirements, from General Contractors/Bidders for the Construction of the New Communal and Recreational Facilities, Demolition of the Building No. 22 and Improvements to street “C” at Rafael Hernández Kennedy Public Housing Project (RQ-4011) Mayagüez, Puerto Rico, on the date and time indicated above.

Action
AVP-IFB-24-25-03 DEMOLITION WORKS AT LOS PEÑAS (RQ-5159) SAN JUAN, PR 08/20/2025 08/21/2025 Adjudicated
Summary

Complete demolition of Los Peñas Public Housing, encompassing 200 dwelling units across eight four-story buildings and a community center. The aim is to prepare the site for future development. Complete removal of all structures including foundations, and all civil, mechanical, and electrical infrastructure on-site. This also includes all architectural elements remaining within the existing buildings such as doors, windows, cabinets, and bathroom equipment, among others. Mechanical demolition methods will be employed without the use of explosives. This includes dismantling and removal of roads, sidewalks, exterior and interior floors slabs and sports structures, as well as underground infrastructure.

Action
AVP-IFB-23-24-03 Modernization Works for Alturas de Cupey 03/18/2024 03/19/2024 Adjudicated
Summary

The Puerto Rico Public Housing Administration (PRPHA) will receive Sealed Bids in accordance with the Bid package instructions and requirements, from General Contractors/Bidders for the Comprehensive Modernization Works for Alturas de Cupey Phase II Public Housing Project (RQ-005034) San Juan, on the date and time indicated above.

Action
AVP-IFB-21-22-04 Satellite Tracking, Management and Administration System 06/13/2022 06/14/2022 Adjudicated
Summary

The PRPHA is seeking Firms to provide a software for Satellite Tracking, Management and Administration System. The software for the Satellite System for tracking, management and administration of the PRPHA’s fleet (System), will meet the needs of the Agency for the tracking, handling, and managing of official vehicles such as pick-ups, cargo vans, passenger vans, SUV’s, trucks, diggers, drags, golf carts and all the equipment that is deemed appropriate.

Action
AVP-IFB-25-26-05 MODERNIZATION CUESTA VIEJA PUBLIC HOUSING,AGUADILLA 05/04/2026 05/05/2026 Cancelled
Summary

The Puerto Rico Public Housing Administration (PRPHA) will receive Sealed Bids in accordance with the Bid package instructions and requirements, from General Contractors/Bidders for the Comprehensive Modernization of 200 Dwelling units, Administrative and Community Facilities, works at Cuesta Vista Public Housing (RQ-5149), Aguadilla, Puerto Rico, on the date and time indicated above.

AVP-IFB-25-26-01 COMPREHENSIVE MODERNIZATION WORKS AT EL TAÍNO 04/27/2026 04/28/2026 Cancelled
Summary

COMPREHENSIVE MODERNIZATION WORKS AT EL TAÍNO PUBLIC HOUSING PROJECT (RQ-5202) SANTA ISABEL, PUERTO RICO SCOPE OF WORK I. Summary This list comprises a general description of the work covered by Contract requirements and mentioned in the Summary of Work Specification Section 01 10 00. This list includes but is not limited to the work outlined in Drawings and Specifications. Carefully reviewed and take into consideration all Bid Documents in the preparation of the Bid Submittal. WORK COVERED BY CONTRACT DOCUMENTS A. The work scope as presented in the project drawings, specifications, and contract documents includes Site Demolition and Site Improvements including walkways, grading, drainage, new infrastructure, new streets, landscape, and lighting. A new roof structure and pergola between the Administration and Community Center, a smaller gazebo, and new playground areas are also included in the Site improvements B. Two new buildings are included: New Basketball Court and New Community Center approx. 2,320 sq. ft; these include: Foundations, Superstructure, Roof, with electrical and mechanical work as defined in this work scope for the Comprehensive Modernization of El Taíno Housing Project located in Santa Isabel, Puerto Rico. C. Comprehensive modernization of existing structures includes selective demolition, structural upgrades, new mechanical and electrical work and new finishes and construction as shown in drawings. There are 95 single-story existing Housing Units divided into 13 rowhouse type buildings and one Administration building approximately 2,600 sq. ft. D. This is a Comprehensive Modernization Project with unknown field conditions that need to be verified and confirmed prior to construction; including, but not limited to: 1. Finish Floor Elevation after Removal of Existing Terrazo floor and setting bed. 2. Confirm the condition and evenness of the existing concrete slab under the existing Terrazo Floor to be removed. 3. Confirm if there is existing light weight concrete for roof drainage slope. E. Before beginning construction work, confirm the site survey construction documents to locate actual infrastructure point of connection locations for LUMA, PRASA Sanitary Sewer, and Potable Water, PR Net, and Stormwater. F. Site demolition is required. Demolition removal of asphalt pavement and concrete sidewalks and undercut, removal of existing light posts and fixtures, trenching and excavation for site utility connections, and excavation for building footings. G. Provide temporary on-site facilities and BMP (best management practices) protection as required by the drawings and technical specifications.

AVP-IFB-24-25-02 New Facilities Rafael Hernández Kennedy, Mayaguez 07/07/2025 07/08/2025 Cancelled
Summary

The Puerto Rico Public Housing Administration (PRPHA) will receive Sealed Bids in accordance with the Bid package instructions and requirements, from General Contractors/Bidders for the Construction of New Communal and Recreational Facilities, Demolition of the Building No. 22 and Improvements to street “C” at Rafael Hernández Kennedy Public Housing Project (RQ-4011) Mayaguez, on the date and time indicated above.

AVP-IFB-24-25-01 NEW COMMUNAL AND RECREATIONAL FACILITIES, DEMOLITION BUILDING No. 22 AND IMPROVEMENTS TO STREET “C” AT RAFAEL HERNÁNDEZ 10/04/2024 12/12/2024 Cancelled
Summary

The scope of this work comprises the construction of new communal and recreational facilities of Rafael Hernández Public Housing Project (RQ-004011), located at State Road #2, KM. 155.5 Intersection William Dunscombe Ave., Marina Meridional Ward, Municipality of Mayagüez, Puerto Rico. The full extent of the work is shown on the final construction drawings (plans), the Contract Documents and the Technical Specifications.

AVP-IFB-23-24-05 Storm Sewer System FSO Elderly 05/07/2024 05/08/2024 Cancelled
Summary

Felipe Sanchez Osorio Elderly Public Housing is a recently constructed housing project (completed in 2018), consisting in 153 houses of one and two bedrooms, exclusive for elder and handicap people. Consequently, the site of the project is designed with minimum surface slopes, in order to comply with Fair Housing requirements. It is located at 153-159 Ignacio Arzuaga Street at the Martin Gonzalez Ward, at the Municipality of Carolina, Puerto Rico. The work includes furnishing all labor, materials, equipment, tools and performing all operations for the connection of sanitary sewers and appurtenances, including excavation, trenching, back filling and all appurtenant work, as required. The Contractor shall furnish al new materials of the size and kind shown on the shop drawings and/or approved manufacture specifications, which shall meet the following specifications or requirements. If any of the material is not specified on the shop drawings, the Contractor may use any of the types listed in these Specifications.

Mostrando entradas 1 al 10 de un total de 45 entradas

Some documents on this page are saved in alternative formats. To view these documents, you must have the following free software installed.

PDF Documents: Download Adobe® Reader®

Logotipo de la Administración de Vivienda Pública.
Logotipo de Healthy Homes Logo equidad de genero Logotipo de la Oficina de la Inspectora General. Logotipo de EPA Logotipo del Departamento de Familia. Logotipo de Community Development Block Grant Disaster Recovery Program Logotipo de la Oficina del Inspector General, Infórmanos.